Farriers Green, Rainham
Client: Esquire Developments
Location: Rainham, Kent
Development: 46 New Homes
Duration: 2024–2026
Complete Groundworks Package for 46 New Homes
Byrne Contractors was appointed by Esquire Developments to deliver the complete groundworks and civil engineering package at Farriers Green, a 46-home residential development in Rainham, Kent.
Starting on site in 2024, our team remained involved throughout the development, taking the project from the initial infrastructure and substructure works through to the final external finishes ahead of completion in 2026.
Our scope included the construction of the site roads and sewers, Section 278 highway works, foundations, substructures and complete foul and surface water drainage systems.
As the development progressed, our teams continued through the external works and finishing stages, completing patios, footpaths, kerbing, block paving, driveways, topsoiling and associated landscaping preparation.
Scope of Works
Roads and infrastructure
Foul and surface water sewers
Section 278 works
Foundations
Substructures
Plot drainage
Service infrastructure
Kerbing and footpaths
Patios and paved areas
Block paved driveways
External finishing works
Topsoil placement and grading
Final plot and development finishes
From the Ground Up
Farriers Green demonstrates Byrne Contractors' ability to deliver a complete residential groundworks package across the full life of a development.
From the first excavations and below-ground infrastructure through to the final paving, paths and topsoil, our team worked alongside Esquire Developments to help bring all 46 homes and the surrounding infrastructure through to completion.
Project completed in 2026.